Deutsche Telekom
Civil Construction

Starlink for Civil Construction: internet at the job site from day one

Construction sites, job fronts, and temporary bases connected without waiting months for infrastructure. The kit follows the construction cycle and moves to the next site when finished.

Get a free diagnosis3 min

No commitment · No credit card · Exclusive B2B service (CNPJ) · Proposal within 48h

99,9%
Guaranteed availability
24×7
Dedicated support
CNPJ
Single invoice with tax receipt
25–60ms
Typical latency

What usually hinders connectivity in construção civil

Fiber deadline longer than project timeline

A construction site lasts months; installing fiber in a new area can take longer than the foundation phase itself.

Paper measurement and daily work log

No connection, manual labor for pointing, daily logs, and measurements return to manual spreadsheets and arrive late at the office.

BIM and heavy projects

Downloading and syncing high-res BIM models and drawings over an engineer's phone hotspot just isn't viable.

Job site security

Cameras and access control require a permanent link, even outside working hours.

How Telekom solves it

Same-day activation

Power and open sky are enough. No civil works, no poles, no towers, and no waiting for technical feasibility.

A kit that moves with the job site

Construction site finished? The terminal is uninstalled and relocated to the next front, preserving the investment.

Fixed-term business contract

Term adjusted to project schedule, with invoice to CNPJ and tax receipt for cost center allocation.

Dedicated technical support

24/7 monitoring and support, with repair time formalized in contract.

Typical industry applications

Digital work log and measurementBIM project and blueprint synchronizationSecurity cameras and access controlTime clock and workforce trackingVideo conferencing with office and clientConstruction ERP and document issuanceAdministrative container Wi-FiDrones and photographic record of physical progress
Starting point

What we usually recommend in construção civil

Antenna

Standard Kit for the main site and administrative container; Mini Kit for remote work fronts and survey teams.

Plan

Data plans from 500 GB to 2 TB per site, depending on the number of users, cameras, and synchronized project volume.

Projects with heavy 24h camera use usually move up one data plan tier compared to initial estimated consumption.

Frequently Asked Questions

Questions from those operating in construção civil

Can I get internet at the construction site before permanent power?

Yes. The terminal operates with a generator or UPS until permanent power is available - the Standard's typical consumption is between 50 and 75 W.

Can I take the antenna to the next job site?

Yes. The kit is portable and reinstallable. Upon project completion, it is disassembled and activated at the new site, maintaining the same contract.

Can I contract for a short period, only during the construction?

Yes. The term is negotiated according to the schedule. When generating the proposal, it's possible to define a differentiated term, adjusted to the duration of the construction contract.

Can the connection support 24/7 security cameras?

Yes, provided the data allowance is dimensioned for it. Cameras with continuous cloud recording are the item that consumes the most bandwidth on a construction site and are included in the diagnostic calculation.

How many devices does the kit's router support?

The built-in router easily supports over 128 devices. For large construction sites, we recommend bypass mode with distributed corporate access points.

Do I need a license or authorization to install?

No civil work, tower, or radio frequency licensing is required from the company. Installation is plug-and-play on a base, mast, or container roof.

Other sectors we serve

Discover the ideal kit and plan for your operation

Diagnosis in 3 minutes. Personalized proposal in up to 48h.